Thursday, March 26, 2026

N. Samar Gets P20 Billion Wind Energy Investment

The Northern Samar Provincial Government welcomed the decision of Singapore-based Vena Energy’s local unit, Gemini Wind Energy Corp. (GWEC), to invest P20.2 billion to build a 304-megawatt  (MW) wind farm in the province. The farm is located on the border that covers San Isidro, Northern Samar, and Calbayog City some 235-km north of Tacloban City, the regional capital. The wind farm will introduce 38 wind turbine generators and was targeted to be operational last Monday, December 15, 2026.

LEAVE A REPLY

Please enter your comment!
Please enter your name here

Most Popular

Emergency Preparedness for Community...

As part of ongoing efforts to strengthen safety, awareness,...

Co Admits Guilt, But...

FORMER AKO BICOL partylist Rep. Zaldy Co must have...

Lawmakers Face Raps, Martin...

SOON enough, criminal charges will be filed against Senators...

Due Process Over Sensational...

DEMOCRACY IN THE Philippines is often viewed as an...

Interpol Red Notice Sought...

THE GOVERNMENT IS banking on the International Police Organization...

Related

45-Day Fuel Buffer Ain’t Much

A 45-DAY fuel buffer isn’t something that the Department...

Strong Start: BIR Exceeds Target

WITH RADICAL REFORMS in place, the Bureau of Internal...

Actionize 5 Economic Pillars For Positive Change

BEING THE OLDEST at 140 years old but still...

Palace Aborts PUV Fare Hike

TO THE DISMAY of drivers and operators of passenger-hailing...

Defense Chief Wants Missile Interceptors

IN WHAT LOOKS more like an indirect admission of...

More from Author